8100.8 C - FAA ORDER 8100.8C (W/ CHANGE 1), DESIGNEE MANAGEMENT HANDBOOK (04 MAY 2007)
NO NUMBER 2008 - EARNED VALUE MANAGEMENT (EVM) SYSTEM ACCEPTANCE GUIDE, UNITED STATES DEPARTMENT OF TRANSPORTATION, FEDERAL AVIATION ADMINISTRATION (JUN 2008)
NO NUMBER - EARNED VALUE MANAGEMENT (EVM) GUIDE (AUG 2005) (DOT/FAA)
8110.37 - FAA ORDER 8110.37D, DESIGNATED ENGINEERING REPRESENTATIVE (DER) HANDBOOK (10 AUG 2006)
8130.21 E - FAA ORDER 8130.21E, PROCEDURES FOR COMPLETION AND USE OF THE AUTHORIZED RELEASE CERTIFICATE, FAA FORM 8130-3, AIRWORTHINESS APPROVAL TAG (29 SEP 2006)
8130.21 F - FAA ORDER 8130.21F, PROCEDURES FOR COMPLETION AND USE OF THE AUTHORIZED RELEASE CERTIFICATE, FAA FORM 8130-3, AIRWORTHINESS APPROVAL TAG (30 MAY 2008)
GHB-7150.1 A - GHB 7150.1A, GODDARD SPACEFLIGHT CENTER (GSFC): PROJECT MANAGER'S HANDBOOK (NASA-TM-101941) (APR 1972)
GPR 7120.3 B - GPR 7120.3B, GODDARD PROCEDURAL REQUIREMENTS: MANAGEMENT OF PRINCIPAL INVESTIGATOR MODE (PI-MODE) MISSIONS (15-DEC-2007)
ED-5 - INTRODUCTION TO PROJECT SCHEDULING - 2 DAY CLASS - NASA/GSFC (5TH EDITION, JUNE 2003)
DI-MGMT-81861 - INTEGRATED PROGRAM MANAGEMENT REPORT (IPMR) IMPLEMENTATION GUIDE (24-JAN-2013) [USED IN CONJUNCTION WITH DI-MGMT-81861]
NO NUMBER - INTEGRATED PROJECT MANAGEMENT HANDBOOK (08 FEB 2002)
ASAM 2011 - AVIATION SOURCE APPROVAL AND MANAGEMENT (SAM) HANDBOOK, JOINT AERONAUTICAL COMMANDERS GROUP (JAGG) (16-MAR-2011)
JPM-HDBK 1996 - JOINT PROGRAM MANAGEMENT HANDBOOK (2ND ED), DEFENSE ACQUISITION UNIVERSITY (JUL-1996)
JPM-HDBK 2004 - JOINT PROGRAM MANAGEMENT HANDBOOK (3RD ED), DEFENSE ACQUISITION UNIVERSITY (JUL-2004)
JSC 27296 A - JSC 27296A, PROGRAM REQUIREMENTS DOCUMENT (PRD) AND PROJECT MANAGEMENT PLAN (PMP) FOR THE ALPHA MAGNETIC SPECTROMETER (AMS) PAYLOAD INTEGRATION HARDWARE (PIH) (AUG 2000)
JSC 28484 - JSC 28484, PROGRAM REQUIREMENTS DOCUMENT (PRD) FOR JOHNSON SPACE CENTER (JSC) NON-CRITICAL GOVERNMENT FURNISHED EQUIPMENT (24 JAN 2000) (W/ CHANGE SHEET DTD 24 FEB 2000
DRD - DRD, JSC DATA REQUIREMENTS DESCRIPTION (DRD): ORGANIZATIONAL CONFLICT OF INTEREST (OCI) PLAN (28-FEB-2012)
LAPD 1150.2 2005 - LAPD 1150.2, LANGLEY POLICY DIRECTIVE: COUNCILS, BOARDS, PANELS, COMMITTEES, TEAMS, AND GROUPS (27 JUN 2005)
LPR 1046.1 - LPR 1046.1, LANGLEY PROCEDURAL REQUIREMENTS: NASA LANGLEY RESEARCH CENTER EMERGENCY PLAN (29 JAN 2007)
LPR 7120.4 2009 - LPR 7120.4, LANGLEY PROCEDURAL REQUIREMENTS: LANGLEY RESEARCH CENTER - TECHNICAL AUTHORITY IMPLEMENTATION PLAN (05 AUG 2009)
LPR 7120.6 2010 - LPR 7120.6, LANGLEY PROCEDURAL REQUIREMENTS: LESSONS LEARNED PROCESS FOR SUSTAINED PROCESS IMPROVEMENTS (22 DEC 2010)
LPR 7510.1 2009 - LPR 7510.1, LANGLEY PROCEDURAL REQUIREMENTS: PROJECT INITIATION AND PROPOSAL PROCEDURAL REQUIREMENTS (19 MAR 2009)
MSFC-HDBK-3173 - MSFC-HDBK-3173, MULTIPROGRAM/PROJECT COMMON-USE DOCUMENT: PROJECT MANAGEMENT AND SYSTEM ENGINEERING HANDBOOK (30 MAY 2001) [SUPERSEDING MM 7120.2, MSFC PROJECT MANAGEMENT HANDBOOK AND MSFC-HDBK-1912, MSFC SYSTEMS ENGINEERING HANDBOOK]
MSFC-HDBK-3684 - MSFC-HDBK-3684, PROJECT PLANNING AND CONTROL HANDBOOK (26-FEB-2013)
MSFC-HDBK-3173 A - MSFC-HDBK-3173A, MULTIPROGRAM/PROJECT COMMON-USE DOCUMENT: PROJECT MANAGEMENT AND SYSTEM ENGINEERING HANDBOOK (27 OCT 2003)
MSFC-HDBK-3173 B - MSFC-HDBK-3173B, MSFC TECHNICAL STANDARD: PROJECT MANAGEMENT AND SYSTEMS ENGINEERING HANDBOOK (16-OCT-2012)
NAS9-150 - NAS9-150, APOLLO PROGRAM PLAN (28-NOV-1962)
SP-2010-3404 - NASA/SP-2010-3404, NASA SPECIAL PUBLICATION: WORK BREAKDOWN STRUCTURE HANDBOOK (JAN 2010)
SP-2010-3403 2010 - NASA/SP-2010-3403, NASA SPECIAL PUBLICATION: SCHEDULE MANAGEMENT HANDBOOK (JAN-2010)
SP-2010-340 3 - NASA/SP-2010-3406 (REV. 3), NASA SPECIAL PUBLICATION: INTEGRATED BASELINE REVIEW (IBR) HANDBOOK (01-JAN-2010)
SP-2011-XXXX 2011 - NASA/SP-2011-XXXX, NASA SPECIAL PUBLICATION: EARNED VALUE MANAGEMENT HANDBOOK (TBD-MONTH-2011)
TM-104645 - NASA/TM-104645, NASA TECHNICAL MEMORANDUM: THE PI-MODE OF PROJECT MANAGEMENT (APR 1997)
NO NUMBER - NASA WORK BREAKDOWN STRUCTURE (WBS) REFERENCE GUIDE (MAY 1994)
NO NUMBER - NAVAIR RISK ASSESSMENT HANDBOOK (DRAFT - JULY 2002)
NO NUMBER - EARNED VALUE MANAGEMENT (EVM): USING SOFTWARE METRICS AND MEASUREMENTS FOR EARNED VALUE TOOLKIT (OCT 2004)
NICS - NICS, NASA INSTRUMENT CAPABILITY STUDY - FINAL REPORT (DEC 2008)
NPR 7120.5 NID - NPR 7120.5D (NM 7120-81), NASA INTERIM DIRECTIVE (NID) FOR NASA PROCEDURAL REQUIREMENTS: NASA SPACE FLIGHT PROGRAM AND PROJECT MANAGEMENT REQUIREMENTS (22 SEP 2009)
NPG 7120.5 B - NPG 7120.5B, NASA PROCEDURES AND GUIDELINES: NASA PROGRAM AND PROJECT MANAGEMENT PROCESSES AND REQUIREMENTS (21 NOV 2002)
NPG 9501.3 - NPG 9501.3, NASA PROCEDURES AND GUIDELINES: EARNED VALUE MANAGEMENT IMPLEMENTATION ON NASA CONTRACTS (24 NOV 2002)
NPR 7120.5 C - NPR 7120.5C, NASA PROCEDURAL REQUIREMENTS: NASA PROGRAM AND PROJECT MANAGEMENT PROCESSES AND REQUIREMENTS (22 MAR 2005)
NPR 1441.1 D - NPR 1441.1D (W/ CHANGE 5), NASA PROCEDURAL REQUIREMENTS: NASA RECORDS RETENTION SCHEDULES (26 JUN 2009)
NPR 1450.10 D - NPR 1450.10D, NASA PROCEDURAL REQUIREMENTS: NASA CORRESPONDENCE MANAGEMENT AND COMMUNICATIONS STANDARDS AND STYLE (24 MAR 2006)
NPR 7120.5_HDBK - NPR 7120.5, NASA PROCEDURAL REQUIREMENTS: NASA SPACE FLIGHT PROGRAM AND PROJECT MANAGEMENT HANDBOOK (FEB 2010)
NPR 7120.8 - NPR 7120.8 (W/ CHANGE 1), NASA PROCEDURAL REQUIREMENTS: NASA RESEARCH AND TECHNOLOGY PROGRAM AND PROJECT MANAGEMENT REQUIREMENTS (24 NOV 2010)
NPR 7120.5 D - NPR 7120.5D, NASA PROCEDURAL REQUIREMENTS: NASA SPACEFLIGHT PROGRAM AND PROJECT MANAGEMENT PROCESSES AND REQUIREMENTS (06 MAR 2007)
NPR 7120.5 E - NPR 7120.5E, NASA PROCEDURAL REQUIREMENTS: NASA SPACEFLIGHT PROGRAM AND PROJECT MANAGEMENT PROCESSES AND REQUIREMENTS W/ CHANGES 1-8 (14-AUG-2012)
ESSOP - ESSOP, DEPARTMENT OF ENERGY (DOE) OFFICE OF ENGINEERING AND CONSTRUCTION MANAGEMENT (OECM): EARNED VALUE MANAGEMENT SYSTEM (EVMS) SURVEILLANCE STANDARD OPERATING PROCEDURE (ESSOP)(26-SEP-2011)
DI-MGMT-81861 2012 - OVER TARGET BASELINE (OTB) AND OVER TARGET SCHEDULE (OTS) GUIDE (05-DEC-2012)
DI-MGMT-81861 2003 - OVER TARGET BASELINE (OTB) AND OVER TARGET SCHEDULE (OTS) HANDBOOK (07-MAY-2003)
5-11 1999 - PAMPHLET 5-11, MANAGEMENT: VERIFICATION, VALIDATION, AND ACCREDITATION OF ARMY MODELS AND SIMULATIONS (30 SEP 1999)
PSM/PBL 2005 - PBL GUIDE - PERFORMANCE BASED LOGISTICS (PBL): A PROGRAM MANAGER’S PRODUCT SUPPORT GUIDE (MAR-2005) [S/S BY PRODUCT SUPPORT MANAGER (PSM) GUIDEBOOK DATED APRIL 2011]
PSM/PBL 2013 - PRODUCT SUPPORT MANAGER GUIDEBOOK (APR-2011)
SMC-S-019 A - SMC-S-019 (REV. A) (2008), AFSC SPACE AND MISSILE SYSTEMS CENTER STANDARD: PROGRAM AND SUBCONTRACTOR MANAGEMENT (11 AUG 2008)
COMPLIANCE_STDS 2014 - COMPLIANCE STANDARDS FOR SPACE AND MISSILE SYSTEMS CENTER (SMC) ACQUISITIONS (14-FEB-2013) [W/ UPDATED ITEM #66 THROUGH 02-SEP-2014]
No Number 1998 - INTEGRATED BASELINE REVIEW (IBR) TEAM HANDBOOK, [AIR FORCE SPACE AND MISSILE SYSTEMS CENTER (SMC)] (01-MAY-1998)
NO NUMBER - MANAGEMENT HANDBOOK, NASA HEADQUARTERS SCIENCE MISSION DIRECTORATE (SMD) (08 FEB 2008)
SOPI 5.0-2 - SOPI 5.0-2, STANDARD OPERATING PROCEDURE INSTRUCTION: BASELINE PROGRAMMATIC ASSESSMENT PROCESS (30 JUN 2010)
SRB_HDBK - STANDING REVIEW BOARD (SRB) HANDBOOK FOR NPR 7120.5D (12 NOV 2009)
SRDR 2019 - SOFTWARE RESOURCES DATA REPORT (SRDR) IMPLEMENTATION GUIDANCE, THE (01-FEB-2019)
NO NUMBER - SUBCONTRACTING MANAGEMENT HANDBOOK, DEFENSE SYSTEMS MANAGEMENT COLLEGE (1ST EDITION) (1988)
SW_COST 2010 - SOFTWARE DEVELOPMENT COST ESTIMATING GUIDEBOOK (OCT-2010)
AoA 2004 - OFFICE OF AEROSPACE STUDIES ANALYSIS HANDBOOK - A GUIDE FOR PERFORMING ANALYSIS STUDIES: FOR ANALYSIS OF ALTERNATIVES (AOA) OR FUNCTIONAL SOLUTION ANALYSES (JUL-2004)
ECSS-M-10 B - ECSS-M-10B, SPACE PROJECT MANAGEMENT: PROJECT BREAKDOWN STRUCTURES (13-JUN-2003)
WSRC-IM-2002-00002 - WSRC-IM-2002-00002, DEPARTMENT OF ENERGY GUIDEBOOK TO DECISION-MAKING METHODS (DEC 2001)
RP-2004-00730 1 - WSRC-RP-2004-00730 (REV. 1), WSRC EARNED VALUE MANAGEMENT SYSTEM (EVMS) SYSTEM DESCRIPTION (20 MAY 2005)