EverySpec Standards
Home > Library > DoD > DoD-UFC > ufc 3 501 03n-16jan2004

UFC 3-501-03N, UNIFIED FACILITIES CRITERIA (UFC) ELECTRICAL ENGINEERING PRELIMINARY CONSIDERATIONS (16 JAN 2004)

UFC 3-501-03N, UNIFIED FACILITIES CRITERIA (UFC) ELECTRICAL ENGINEERING PRELIMINARY CONSIDERATIONS (16 JAN 2004). This UFC is comprised of two sections. Chapter 1 introduces this UFC and provides a listing of references to other Tri-Service documents closely related to the subject. Appendix A contains the full text copy of the previously released Military Handbook (MIL-HDBK) on this subject. This UFC serves as criteria until such time as the full text UFC is developed from the MIL-HDBK and other sources. This UFC provides general criteria for preliminary design considerations for electrical engineering. Note that this document does not constitute a detailed technical design, maintenance or operations manual, and is issued as a general guide to the consideration 3-501-s associated with design of economical, efficient and environmentally acceptable heating plants.

UFC 3-501-03 Rev. N

    

Version:
N01-2004401.15 KB ufc_3_501_03n(16jan2004

Simple Search
MilSpec Search



About Us   |   Terms of Use   |   DMCA   |   Privacy   |   EverySpec LLC © 2009 - 2024   All rights reserved.