JSC 27296A, PROGRAM REQUIREMENTS DOCUMENT (PRD) AND PROJECT MANAGEMENT PLAN (PMP) FOR THE ALPHA MAGNETIC SPECTROMETER (AMS) PAYLOAD INTEGRATION HARDWARE (PIH) (AUG 2000)
JSC 27296A, PROGRAM REQUIREMENTS DOCUMENT (PRD) AND PROJECT MANAGEMENT PLAN (PMP) FOR THE ALPHA MAGNETIC SPECTROMETER (AMS) PAYLOAD INTEGRATION HARDWARE (PIH) (AUG 2000)., This document establishes the program, design, safety, reliability, quality assurance,
test facility, integration test and shipping requirements for the AMS-02 payload.
Planning and Integration Branch hardware development is limited to the Payload
Integration Hardware (PIH) as described in this document. It does not address the
internal AMS-02 Experiment configuration. It does address the configuration of the
AMS-02 interfaces to the Space Shuttle and International Space Station.
These requirements apply to new flight hardware and to modifications of previously
flown flight hardware.