JSC 27301E, MATERIALS AND PROCESSES SELECTION, CONTROL, AND IMPLEMENTATION PLAN FOR JSC FLIGHT HARDWARE (NOV 2005)
JSC 27301E, MATERIALS AND PROCESSES SELECTION, CONTROL, AND IMPLEMENTATION PLAN FOR JSC FLIGHT HARDWARE (NOV 2005)., This Materials and Processes Selection, Control, and Implementation Plan defines the implementation of the materials and processes (M&P) requirements for all new flight hardware developed by the NASA Johnson Space Center (JSC). Space Shuttle GFE, International Space Station GFE, Constellation Program GFE, and JSC-developed payload hardware are to be designed and manufactured in accordance with this plan. The plan describes the implementation of the M&P requirements in JSC 49774A, Manned Spacecraft Requirements for Materials and Processes; SSP 30233, Space Station Requirements for Materials and Processes; SE-R-0006, General Specification Space Shuttle System Requirements for Materials and Processes; and JPR 8080.5A, JSC Design and Procedural Standards.
This plan defines the responsibilities of the JSC Materials & Processes Branch and JSC contractors for flight hardware M&P requirements implementation and verification, and includes modifications of Space Shuttle, ISS, and Crew Exploration Vehicle requirements for flight hardware. The contents of this document are consistent with the tasks performed for the ISS as defined in SSP 41000, System Specification for the International Space Station.
This flight hardware Materials and Processes Selection, Control, and Implementation Plan shall be implemented on all new contracts for the procurement of JSC flight hardware, and shall be included in existing contracts through contract changes. This document is under the control of the JSC Structural Engineering Division (JSC Code ES), and any changes or revisions shall be approved by the same organization.