NASA/TM-108542, TECHNICAL MEMORANDUM: TESTING FOR RANDOM LIMIT LOAD VERSUS STATIC LIMIT LOAD (SEPT-1997)
NASA/TM-108542, TECHNICAL MEMORANDUM: TESTING FOR RANDOM LIMIT LOAD VERSUS STATIC LIMIT LOAD (SEPT-1997)., A study completed in 1993 by the Marshall Space Flight Center (MSFC) Random Loads/Criteria
Issues Team concluded, after an extensive literature search, that almost no analytical or empirical documentation
exists on the subject of the relationship between random limit load (stress) and static limit
load (stress). The consensus of the team was that it is a complex subject and requires a carefully planned
effort to produce an effective, yet practical, solution. In addition, no amount of analysis or planning will
ever completely solve the problem of the dynamic-to-static limit load relationship. It is paramount that
ample validation testing be accomplished so a database of hardware response can be built.