EverySpec Standards
Home > Library > NASA > NASA-GSFC > GSFC-General > LISA SEMP APR2002

SYSTEM ENGINEERING MANAGEMENT PLAN (SEMP), LASER INTERFEROMETER SPACE ANTENNA (SEMP) (DRAFT) (16-APR-2002)

SYSTEM ENGINEERING MANAGEMENT PLAN (SEMP), LASER INTERFEROMETER SPACE ANTENNA (SEMP) (DRAFT) (16-APR-2002)., The plan is intended to document the activities to be performed by the National Aeronautics and Space Administration (NASA) Goddard Space Flight Center’s (GSFC’s) System Engineering Office in support of the Laser Interferometer Space Antenna (LISA) Project’s mission formulation. The System Engineering Office will update the System Engineering Management Plan (SEMP) near the end of the Formulation Phase in preparation for the Implementation Phase.

SEMP Rev. DRAFT

    

Version:
DRAFT04-2002680.24 KB LISA_SEMP_APR2002
00-000062.64 KB TEMPLATE_SEMP_NASA-GRC.

Simple Search
MilSpec Search



About Us   |   Terms of Use   |   DMCA   |   Privacy   |   EverySpec LLC © 2009 - 2024   All rights reserved.