EverySpec Standards
Home > Library > NASA > NASA-GSFC > GSFC-Code-Series > NASA 300 PG 7120--2--2D

300-PG-7120.2.2D, MISSION ASSURANCE GUIDELINES (MAG) FOR TAILORING TO THE NEEDS OF THE GODDARD SPACE FLIGHT CENTER (GSFC) PROJECTS (27 JAN 2004)

300-PG-7120.2.2D, MISSION ASSURANCE GUIDELINES (MAG) FOR TAILORING TO THE NEEDS OF THE GODDARD SPACE FLIGHT CENTER (GSFC) PROJECTS (27 JAN 2004)., The purpose of this document is to serve as a resource to the Project Manager and OSSMA, in conjunction with 300- PG-7120.2.1, “Mission Assurance Guidelines (MAG) Implementation”, in supporting the development of a realistic set of mission assurance requirements tailored to specific needs of an individual project. It is assumed that the project will select, tailor and then place the appropriate mission assurance requirements either directly into the contract SOW, and/or within a stand-alone Mission Assurance Requirements document.

300-PG-7120.2.2D

    

Version:
01-2004989.03 KB NASA-300-PG-7120.2.2D

Simple Search
MilSpec Search



About Us   |   Terms of Use   |   DMCA   |   Privacy   |   EverySpec LLC © 2009 - 2024   All rights reserved.