CxP 70007 (REV. B, CHANGE 001), CONSTELLATION DESIGN REFERENCE MISSIONS AND OPERATIONAL CONCEPTS (07 JAN 2008)
CxP 70007 (REV. B, CHANGE 001), CONSTELLATION DESIGN REFERENCE MISSIONS AND OPERATIONAL CONCEPTS (07 JAN 2008)., The document encompasses the top level mission scenarios and operational concepts. Project-level Operational Concepts documents provide the next level of detail
envisioned for each System. The scope of this document represents the integrated
stakeholder expectations and common vision for the Constellation Program Systems.
The document is divided into five sections. The System Overview describes the
numerous vehicles and organizations that define the Constellation Architecture. This is
a summary of top-level information and is contained in numerous Constellation
products. The following section describes the Design Reference Missions (DRMs).
Next, a General section provides overarching concepts that span multiple phases or
that are not specific to any phase, but are to be considered when developing
requirements and determining effective design solutions. Next, beginning with
expectations for pre-ship build and checkout of the flight vehicles through recovery and
refurbishment, the concepts for nominal Operations and Capabilities by Phase,
including the role of the operations systems are documented. Lastly, the operational
concepts that describe all contingency scenarios that are intended to be captured in
requirements for mitigation are presented. There are three Annexes to this document
which contain additional detail about communications and timelines for the DRMs.
Annex 1 is the Joint Constellation (Cx) – Space Communications and Navigation
(SCaN) Concept of Operations. It contains a view of the communications, tracking, and
network operations that will support the DRMs. Annex 2 is the Cx Flight Operations
Scenarios and includes DRM timelines and ground rules. Annex 3 is the Ground
Summary Timeline.