EverySpec Standards
Home > FSC-CODE > ISDA

FSC: ISDA - INTERNATIONAL STANDARDIZATION DOCUMENTS - ARMY

JOTP-052 - JOTP-052, DEPARTMENT OF DEFENSE JOINT ORDNANCE TEST PROCEDURE (JOTP): GUIDELINE FOR QUALIFICATION OF FUZES, SAFE AND ARM (S&A) DEVICES, AND IGNITION SAFETY DEVICES (ISD) (10-FEB-2012)
25-32 1998 - PAMPHLET 25-32, INFORMATION MANAGEMENT: PUBLISHING AND PRINTING - INDEX OF INTERNATIONAL TEST OPERATIONS PROCEDURES AND TECOM TEST OPERATIONS PROCEDURES (16-MAR-1998)
TOP-1-1-014 - TOP-1-1-014, TEST OPERATIONS PROCEDURE: RIDE DYNAMICS (07-JAN-2005)
TOP-1-2-621 - TOP-1-2-621, TEST OPERATIONS PROCEDURE: OUTDOOR SAND AND DUST TESTING (06-FEB-2009)
TOP-1-2-500 - TOP-1-2-500, TEST OPERATIONS PROCEDURE: TRANSPORTABILITY (15-SEP-2008)
TOP-1-1-005 - TOP-1-1-005, TEST OPERATIONS PROCEDURE: COLD REGIONS - MATERIAL EFFECTS (22-SEP-2008)
TOP-1-1-016 - TOP-1-1-016, TEST OPERATIONS PROCEDURE: ELECTROENCEPHALOGRAM-BASED MEASUREMENT OF WORKLOAD, ENGAGEMENT, AND FATIGUE (12-APR-2011)
TOP-1-1-003 - TOP-1-1-003, TEST OPERATIONS PROCEDURE: COLD REGIONS PERSONNEL EFFECTS (15-SEP-2008)
TOP-1-1-004 - TOP-1-1-004, TEST OPERATIONS PROCEDURE: COLD REGIONS - INSTRUMENTATION OPERATION AND USE (10-OCT-2007)
TOP-1-1-015 - TOP-1-1-015, TEST OPERATIONS PROCEDURE: HUMAN SYSTEMS INTEGRATION (15-OCT-2007)
TOP-1-1-017 - TOP-1-1-017, TEST OPERATIONS PROCEDURE: COLD REGIONS ENVIRONMENTAL CONSIDERATIONS (03-FEB-2009)
TOP-1-1-030 - TOP-1-1-030, TEST OPERATIONS PROCEDURE: RAM-D AND ILS ANALYSIS (08-SEP-2008)
TOP-1-1-062 - TOP-1-1-062, TEST OPERATIONS PROCEDURE: ENVIRONMENTAL EFFECTS DATA COLLECTION (12-SEP-2008)
TOP-1-2-511 - TOP-1-2-511, TEST OPERATIONS PROCEDURE: ELECTROMAGNETIC ENVIRONMENTAL EFFECTS SYSTEM TESTING (21-SEP-2009)
TOP-1-2-501 - TOP-1-2-501, TEST OPERATIONS PROCEDURE: RAIL IMPACT TESTING (15-SEP-2008)
TOP-1-2-622 - TOP-1-2-622, TEST OPERATIONS PROCEDURE: VERTICAL ELECTROMAGNETIC PULSE (VEMP) TESTING (11-SEP-2009)
TOP-1-2-500 - TOP-1-2-500 (W/ CHANGE-3), TEST OPERATIONS PROCEDURE: TRANSPORTABILITY (20-MAR-1979)
TOP-1-2-620 - TOP-1-2-620, TEST OPERATIONS PROCEDURE: HIGH-ALTITUDE ELECTROMAGNETIC PULSE (HEMP) TESTING (10-NOV-2011)
TOP-1-1-011 1981 - TOP-1-1-011, TEST OPERATIONS PROCEDURE (TOP): VEHICLE TEST FACILITIES AT ABERDEEN TEST CENTER (ATC) AND YUMA TEST CENTER (YTC) (06-JUL-1981)
TOP-1-2-612 2008 - TOP-1-2-612, TEST OPERATIONS PROCEDURE (TOP): NUCLEAR ENVIRONMENT SURVIVABILITY (24-OCT-2008)
TOP-1-2-602 2011 - TOP-1-2-602, TEST OPERATING PROCEDURE (TOP): LABORATORY VIBRATION TEST SCHEDULE DEVELOPMENT FOR MULTI-EXCITER APPLICATIONS (17-AUG-2011)
TOP-1-1-011 2012 - TOP-1-1-011, TEST OPERATIONS PROCEDURE (TOP): VEHICLE TEST FACILITIES AT ABERDEEN TEST CENTER (ATC) AND YUMA TEST CENTER (YTC) (27-FEB-2012)
TOP-1-1-020 2013 - TOP-1-1-020, TEST OPERATING PROCEDURE: TROPICAL REGIONS ENVIRONMENTAL CONSIDERATIONS (08-FEB-2013)
TOP-1-2-608 A - TOP-1-2-608A, TEST OPERATIONS PROCEDURE: SOUND LEVEL MEASUREMENTS (01-JAN-2011)
TOP-1-2-608 A - TOP-1-2-608A, TEST OPERATIONS PROCEDURE: SOUND LEVEL MEASUREMENTS (17-JUL-1981)
TOP-2-1-003 - TOP-2-1-003, TEST OPERATIONS PROCEDURE: HYBRID VEHICLES (12-AUG-2008)
TOP-2-2-500 - TOP-2-2-500, TEST OPERATIONS PROCEDURE: VEHICLE CHARACTERISTICS (14-FEB-2008)
TOP-2-2-540 - TOP-2-2-540, TEST OPERATIONS PROCEDURE: TESTING OF UNMANNED GROUND VEHICLE (UGV) SYSTEMS (30-JUN-2008)
TOP-2-1-007 - TOP-2-1-007, TEST OPERATIONS PROCEDURE: DYNAMIC DISPLACEMENT MEASUREMENT (18-SEP-2008)
TOP-2-2-604 - TOP-2-2-604, TEST OPERATIONS PROCEDURE: DRAWBAR PULL (26-SEP-2007)
TOP-2-4-002 - TOP-2-4-002, TEST OPERATIONS PROCEDURE: COLD REGIONS TEST OF TRACKED AND WHEELED VEHICLES (22-SEP-2009)
TOP-2-2-819 - TOP-2-2-819, TEST OPERATIONS PROCEDURE: SAND AND DUST TESTING OF WHEELED AND TRACKED VEHICLES AND STATIONARY EQUIPMENT (18-NOV-2009)
TOP-2-2-614 - TOP-2-2-614, TEST OPERATIONS PROCEDURE: TOXIC HAZARDS TESTS FOR VEHICLES AND OTHER EQUIPMENT (28-FEB-1995)
TOP-2-2-808 - TOP-2-2-808, TEST OPERATIONS PROCEDURE: FIELD SHOCK AND VIBRATION TESTS OF VEHICLES (01-OCT-1981)
TOP-02-2-603 1987 - TOP-02-2-603 (W/ CHANGE-1), TEST OPERATIONS PROCEDURE (TOP): VEHICLE FUEL CONSUMPTION (04-FEB-1987)
TOP-02-2-603 2012 - TOP-02-2-603, TEST OPERATIONS PROCEDURE (TOP): VEHICLE FUEL CONSUMPTION (05-OCT-2012)
TOP-2-2-808 A - TOP-2-2-808A, TEST OPERATIONS PROCEDURE: FIELD SHOCK AND VIBRATION TESTS OF VEHICLES (15-JUN-2011)
TOP-3-2-045 - TOP-3-2-045, TEST OPERATIONS PROCEDURE: SMALL ARMS - HAND AND SHOULDER WEAPONS AND MACHINEGUNS (17-SEP-2007
TOP-4-2-831 - TOP-4-2-831, TEST OPERATIONS PROCEDURE: USE OF BLAST TEST DEVICE (BTD) DURING AUDITORY BLAST OVERPRESSURE MEASUREMENT (12-AUG-2008)
TOP-5-2-521 - TOP-5-2-521, TEST OPERATIONS PROCEDURE: PYROTECHNIC SHOCK TEST PROCEDURES (20-NOV-2007)
TOP-5-2-522 - TOP-5-2-522, TEST OPERATIONS PROCEDURE: PERFORMANCE TESTING OF EXPLOSIVE COMPONENTS (20-NOV-2007)
TOP-5-2-599 - TOP-5-2-599, TEST OPERATIONS PROCEDURE: CREEP TEST PROCEDURES (20-NOV-2007)
TOP-5-2-582 - TOP-5-2-582, TEST OPERATIONS PROCEDURE: TEMPERATURE-ALTITUDE TESTS FOR MISSILE SYSTEM AND MISSILE SUBSYSTEM EQUIPMENT (08-JAN-2002)
TOP-5-2-582 A - TOP-5-2-582A, TEST OPERATIONS PROCEDURE: TEMPERATURE-ALTITUDE TESTS FOR MISSILE SYSTEM AND MISSILE SUBSYSTEM EQUIPMENT (02-JUN-2011)
TOP-6-2-507 - TOP-6-2-507, TEST OPERATIONS PROCEDURE: SAFETY AND HEALTH EVALUATION - COMMAND, CONTROL, COMMUNICATION, COMPUTERS, INTELLIGENCE, SURVEILLANCE, RECONNAISSANCE, AND ELECTRONIC WARFARE (10-MAR-2009)
TOP-6-3-044 - TOP-6-3-044, TEST OPERATIONS PROCEDURE: OPTICAL TRANSFER FUNCTION (24-JUL-2009)
TOP-7-3-536 - TOP-7-3-536, TEST OPERATIONS PROCEDURE: HEALTH USAGE MONITORING SYSTEM TESTING (16-MAY-2011)
TOP-7-3-061 - TOP-7-3-061, TEST OPERATIONS PROCEDURE: SIMULATOR TEST AND EVALUATION (13-JAN-2009)
TOP-7-4-020 - TOP-7-4-020, TEST OPERATIONS PROCEDURE: FLIGHT TEST TECHNIQUES (01-JUL-2009)
TOP-7-3-057 - TOP-7-3-057, TEST OPERATIONS PROCEDURE: PITOR-STATIC SYSTEM CALIBRATIONS (10-APR-2008)
TOP-7-3-537 - TOP-7-3-537, TEST OPERATIONS PROCEDURE: AIRCRAFT NATURAL/ARTIFICIAL ICING (12-FEB-2009
TOP-7-1-001 - TOP-7-1-001, TEST OPERATIONS PROCEDURE: UNMANNED AIRCRAFT SYSTEMS (UAS) TESTING OVERVIEW (02-DEC-2008)
TOP-7-2-033 2013 - TOP-7-2-033, TEST OPERATING PROCEDURE: WEAPONIZED MANNED/UNMANNED AIRCRAFT (14-JAN-2013)
TOP-9-2-270 - TOP-9-2-270, TEST OPERATING PROCEDURE: WATER SUPPLY AND TREATMENT EQUIPMENT (15-SEP-2009)
TOP-9-2-027 - TOP-9-2-027, TEST OPERATIONS PROCEDURE: BRIDGES AND EQUIPMENT (15-SEP-2009)
TOP-9-2-181 - TOP-9-2-181, TEST OPERATIONS PROCEDURE (TOP) 09-2-181: PUMPS, CENTRIFUGAL AND RECIPROCATING (05-MAR-1968)
TOP-9-2-181 A - TOP-9-2-181A, TEST OPERATIONS PROCEDURE (TOP) 09-2-181A: PUMPS, CENTRIFUGAL AND RECIPROCATING (27-APR-2011)
TOP-10-2-204 - TOP-10-2-204, TEST OPERATIONS PROCEDURE (TOP) 10-2-204: GENERAL TESTS OF PERSONAL PROTECTIVE EQUIPMENT (NON-BALLISTIC) - SOFT ARMOR (23-JUL-2012)
Page 1 of 1



About Us   |   Terms of Use   |   DMCA   |   Privacy   |   EverySpec LLC © 2009 - 2024   All rights reserved.