EverySpec Standards
Home > Library > ESA > WBS ECSS-M-10B

ECSS-M-10B, SPACE PROJECT MANAGEMENT: PROJECT BREAKDOWN STRUCTURES (13-JUN-2003)

ECSS-M-10B, SPACE PROJECT MANAGEMENT: PROJECT BREAKDOWN STRUCTURES (13-JUN-2003)., The present document, \"Project Breakdown Structures\", is part of a collection of ECSS standards belonging to the management branch. In order to create the reference system for project management necessary for implementation of a project and ensure consistency, the project shall be broken down into a unique, orderly and exhaustive manner, to allow unambiguous identification of the associated products and models, as well as the tasks and resources necessary. The aim of this ECSS standard is to define the principles to be respected for setting up, using and adapting the breakdown structures and implementing them into a project. The requirements specified herein apply to and affect the supplier and customer at all levels, when the capability to design and supply conforming product needs to be demonstrated. These requirements, as tailored in the related Project Requirements Document, are applicable to any actor of a Space Project.

ECSS-M-10 Rev. B

    
 Status:
Active

 FSC Code:
 MGMT - MANAGEMENT

Version:
B06-20032.30 MB WBS_ECSS-M-10B
A04-199684.29 KB ecss-m-10a

Simple Search
MilSpec Search



About Us   |   Terms of Use   |   DMCA   |   Privacy   |   EverySpec LLC © 2009 - 2024   All rights reserved.