UFC 3-710-01A, UNIFIED FACILITIES CRITERIA (UFC): CODE 3 DESIGN WITH PARAMETRIC ESTIMATING (01-MAR-2005) [aka ARMY CORPS OF ENGINEERS, TI 802-01, TECHNICAL INSTRUCTIONS FOR CODE 3 DESIGN WITH PARAMETRIC ESTIMATING (15-MAY-1998)
UFC 3-710-01A, UNIFIED FACILITIES CRITERIA (UFC): CODE 3 DESIGN WITH PARAMETRIC ESTIMATING (01-MAR-2005) [aka ARMY CORPS OF ENGINEERS, TI 802-01, TECHNICAL INSTRUCTIONS FOR CODE 3 DESIGN WITH PARAMETRIC ESTIMATING (15-MAY-1998)., The purpose of this Technical Instructions (TI) is to provide design policy and technical guidance to the U.S. Army Corps of Engineers (USACE) for Army Military Construction (MILCON) projects when Code 3 design directives are released. Code 3 design directives are intended to accelerate early execution of project design, provide better definition of customer requirements, improve customer involvement, and implement the use of parametric estimating, at a minimum expenditure of Planning and Design (P&D) funds. The purpose of this TI is to define and develop the scope of a project, its site and cost requirements in sufficient details to assure the Office of the Secretary of Defense (OSD) and the Congress that the Army has an executable project.