EverySpec Standards
Home > Library > DoD > DoD-UFC > UFC 3 201 01 01JUN2013

UFC 3-201-01, UNIFIED FACILITIES CRITERIA (UFC): CIVIL ENGINEERING (01-JUN-2013)

UFC 3-201-01, UNIFIED FACILITIES CRITERIA (UFC): CIVIL ENGINEERING (01-JUN-2013)., This UFC provides civil engineering requirements for all new and renovated government-owned facilities for the Department of Defense (DoD). Where other criteria, statutory or regulatory requirements are referenced in the contract, the more stringent requirement must be met. This UFC applies to all service elements and contractors involved in the planning, design and construction of DoD facilities worldwide. It is applicable to all methods of project delivery and levels of construction, but is not applicable to public-private ventures (PPV). All design and construction outside of the United States and United States territories is governed by international agreements, such as the Status of Forces Agreements (SOFA), Host Nation-Funded Construction Agreements (HNFA), and in some instances, Bilateral Infrastructure Agreements (BIA), and country-specific Final Environmental Governing Standards (FGS) or the DoD Overseas Environmental Baseline Guidance Document (OEBGD), DoD 4715.05-G. The OEBGD applies when there are no FGS in place. Therefore, in foreign countries this UFC will be used for DoD projects to the extent that it is allowed by and does not conflict with the applicable international agreements and the applicable FGS or OEBGD. This UFC assumes that appropriate National Environmental Policy Act (NEPA) action has been accomplished prior to committing resources to any proposed activity.

UFC 3-201-01 Rev. 2013

    

Version:
201306-2013462.23 KB UFC_3_201_01_01JUN2013

Simple Search
MilSpec Search



About Us   |   Terms of Use   |   DMCA   |   Privacy   |   EverySpec LLC © 2009 - 2024   All rights reserved.