DI-SESS-82100, DATA ITEM DESCRIPTION (DID): TECHNICAL WORK BREAKDOWN STRUCTURE (TWBS) AND TECHNOLOGY MATURATION PLAN (TMP) (26-JAN-2017)
DI-SESS-82100, DATA ITEM DESCRIPTION (DID): TECHNICAL WORK BREAKDOWN STRUCTURE (TWBS) AND TECHNOLOGY MATURATION PLAN (TMP) (26-JAN-2017)., The Technical Work Breakdown Structure (TWBS) details the threshold
compliant system design down to its lowest level of indenture appropriate for identifying and
determining the maturity of Critical Technology Elements (CTEs). The Technology Maturation
Plan (TMP) details the program’s technology maturation roadmaps for each CTE to achieve
Technology Readiness Levels (TRLs) and the targeted maturity consistent with program
acquisition strategy.
The Independent Technical Review Office (ITRO), along with an independent expert panel, shall
use the TWBS and TMP to assess technology maturity and gauge risk to achieve TRLs by key
acquisition knowledge points.
This Data Item Description (DID) contains the format, content, and intended use information for
the data deliverable resulting from the work task described in the solicitation.