DI-SESS-80989A, DATA ITEM DESCRIPTION (DID): RELIABILITY CENTERED MAINTENANCE (RCM) INACTIVE EQUIPMENT MAINTENANCE (IEM) REQUIREMENT ANALYSIS REPORT (23-SEP-2010) [SUPERSEDING DI-MNTY-80989]
DI-SESS-80989A, DATA ITEM DESCRIPTION (DID): RELIABILITY CENTERED MAINTENANCE (RCM) INACTIVE EQUIPMENT
MAINTENANCE (IEM) REQUIREMENT ANALYSIS REPORT (23-SEP-2010) [SUPERSEDING DI-MNTY-80989]., The Reliability Centered Maintenance (RCM) Inactive Equipment
Maintenance (IEM) Requirement Analysis Report defines tasks to
be performed during equipment inactive periods.
This Data Item Description (DID) contains the format, content,
preparation instructions and intended use for the data
deliverable resulting from the work task described in the 5.1.7
of MIL-STD-3034.
This DID is related to DI-SESS-80979A, RCM Master System and
Subsystem Index (MSSI); DI-SESS-80994A, RCM Functional Block
Diagram (FBD); DI-SESS-80981A, RCM Functional Failure
Analysis(FFA)Report; DI-SESS-80983A, RCM Additional Functionally
Significant Item (AFSI) Selection Report; DI-SESS-80982A, RCM
Functionally Significant Items (FSI) Index; DI-SESS-80980A, RCM
Failure Modes and Effects Analysis (FMEA) Report; DI-SESS-
80984A, RCM Logic Tree Analysis (LTA) with Supporting Rationale
and Justification Report; DI-SESS-80985A, RCM Servicing and
Lubrication Analysis (SLA) Report; DI-SESS-81829, RCM Corrective
Maintenance (CM) Development Report; DI-SESS-80986A, RCM
Maintenance Requirements Index (MRI); DI-SESS-80988A, RCM Task
Definition Report; DI-SESS-80987A, RCM Procedure Validation
Report.
This DID supersedes DI-MNTY-80989.