DI-NDTI-82327, FIRST ARTICLE TEST/INSPECTION PROCEDURES AND REPORT (FAT/IPR) (20-AUG-2020)
DI-NDTI-82327, FIRST ARTICLE TEST/INSPECTION PROCEDURES AND REPORT (FAT/IPR) (20-AUG-2020)., The First Article Test/Inspection Procedures and Report (FAT/IPR) is used to report on the test and inspection results, test and inspection equipment and tooling requirements and setup, inspection criteria, and method of documentation that shall be used by the contractor for first article testing and inspection.