TOP-1-2-511A, TEST OPERATIONS PROCEDURE: ELECTROMAGNETIC ENVIRONMENTAL EFFECTS SYSTEM TESTING (20-NOV-2013)
TOP-1-2-511A, TEST OPERATIONS PROCEDURE: ELECTROMAGNETIC ENVIRONMENTAL EFFECTS SYSTEM TESTING (20-NOV-2013).,
This Test Operations Procedure (TOP) provides the Electromagnetic Environmental Effects (E3) interface requirements and verification criteria for airborne, sea, space, and ground systems, including associated ordnance, as stated in Military Standard (MIL-STD)-464C “Electromagnetic Environmental Effects Requirement for Systems”, as well as ADS-37A-PRF “Aeronautical Design Standard for the Electromagnetic Environmental Effects (E3) Performance and Verification Requirements”.
This TOP supersedes TOP 01-2-511, dated 9 September 2009, TOP 01-2-512 Electromagnetic Compatibility Tests, dated 15 May 1995 and TOP 06-2-560 Compatibility, Electromagnetic dated 12 October 1979.