EverySpec Standards
Home > Library > ARMY > TM-Tech-Manual > tm5 818 5

TM 5-818-5/AFM 88-5.6/NAVFAC P-418 TECHNICAL MANUAL, DEWATERING AND GROUNDWATER CONTROL (15 NOV 1983)

TM 5-818-5/AFM 88-5.6/NAVFAC P-418 TECHNICAL MANUAL, DEWATERING AND GROUNDWATER CONTROL (15 NOV 1983)., This manual provides guidance for the planning, design, supervision, construction, and operation of dewatering and pressure relief systems and of seepage cutoffs for deep excavations for structures. It presents: description of various methods of dewatering and pressure relief; techniques for determining groundwater conditions, characteristics of pervious aquifers, and dewatering requirements; guidance for specifying requirements for dewatering and seepage control measures; guidance for determining the adequacy of designs and plans prepared by contractors; procedures for designing, installing, operating, and checking the performance of dewatering systems for various types of excavations; and descriptions and design of various types of cutoffs for controlling groundwater.

TM 818-5/AFM 88-5.6/NAVFAC P-418

    

Version:
11-19834.90 MB tm5_818_5

Simple Search
MilSpec Search



About Us   |   Terms of Use   |   DMCA   |   Privacy   |   EverySpec LLC © 2009 - 2024   All rights reserved.