TM 5-805-7, TECHNICAL MANUAL: WELDING DESIGN, PROCEDURES AND INSPECTION (20-MAY-1985)
TM 5-805-7, TECHNICAL MANUAL: WELDING DESIGN, PROCEDURES AND INSPECTION (20-MAY-1985)., This manual contains criteria and basic data for welded construction design, construction methods,and inspection procedures for Army construction.
This manual covers only the following welding processes
and materials commonly used for field construction
projects: shielded metal-arc, gas metal-arc,
gas tungsten-arc, flux-cored arc, submerged arc,
exothermic, and arc stud welding processes. Discussions
of physics, chemistry, and metallurgy are limited
to areas helpful in selecting welding processes,
materials, and inspection procedures for the applications
listed in paragraph 1-3. For supplemental
information, see the American Welding Society
(AWS) Welding Handbook (available in five sections)
and TM 9-237.