EverySpec Standards
Home > Library > ARMY > ARMY-General > TI 809-26 01MAR2000

TI 809-26, TECHNICAL INSTRUCTIONS: WELDING - DESIGN PROCEDURES AND INSPECTIONS (01-MAR-2000)

TI 809-26, TECHNICAL INSTRUCTIONS: WELDING - DESIGN PROCEDURES AND INSPECTIONS (01-MAR-2000)., This document provides criteria and guidance for the design and specification of welded structural components and systems in accordance with current technology, standards and materials. This includes information on design approaches, use of technical manuals, guidance on the application of codes and industry standards, and the design and specification of welded details, inspection and quality. The scope of this document is welding for general building construction for military applications, and does not include underwater, piping, or cryogenic applications, bridges, sheet steels, or the welding of materials other than structural steel. A building is defined as any structure, fully or partially enclosed, used or intended for sheltering persons or property.

TI-809-26

    

Version:
03-2000719.79 KB TI_809-26_01MAR2000

Simple Search
MilSpec Search



About Us   |   Terms of Use   |   DMCA   |   Privacy   |   EverySpec LLC © 2009 - 2024   All rights reserved.