EverySpec Standards
Home > Library > MIL-STD > MIL-STD-2000-2999 > MIL-STD-2003A

MIL-STD-2003A, DEPARTMENT OF DEFENSE STANDARD PRACTICE: ELECTRIC PLANT INSTALLATION STANDARD METHODS FOR SURFACE SHIPS AND SUBMARINES (03 SEP 2009] [SUPERSEDING DOD-STD-2003]

MIL-STD-2003A, DEPARTMENT OF DEFENSE STANDARD PRACTICE: ELECTRIC PLANT INSTALLATION STANDARD METHODS FOR SURFACE SHIPS AND SUBMARINES (03 SEP 2009] [SUPERSEDING DOD-STD-2003]., This standard covers shipboard installation requirements for electrical cable, equipment, penetrations, cableways, and connectors. This standard consists of this general standard and five parts as follows: Part 1 (Cable) Preparation and end-sealing, entry to equipment and connectors, repair and splicing. Part 2 (Equipment) Equipment mounting, switchboard mounting, battery equipment, casualty power, and shore power. Part 3 (Penetrations) Swage tubes, stuffing tubes, kickpipes, surface ships and submarines, hull penetration, and general. Part 4 (Cableways) General, submarine, surface ship and cable protection. Part 5 (Connectors) Cable and conductor preparation in accordance with MIL-C-81511, MIL-DTL-5015, MIL-DTL-26482, MIL-DTL-28840, MIL-DTL-22992, and MIL-DTL-38999 connectors.

MIL-STD-2003 Rev. A

    

Version:
B10-2020135.46 KB MIL-STD-2003B
A09-2009134.86 KB MIL-STD-2003A

Simple Search
MilSpec Search



About Us   |   Terms of Use   |   DMCA   |   Privacy   |   EverySpec LLC © 2009 - 2024   All rights reserved.